Pod-Trak undertook a challenging role in this project to deliver a civils package with large programme and logistical constraints.
An ever-changing P-Way design required tactical installation of the ensuing civils element of the project, with very little re-work or re-visits required by our team.
The walkways consisted of reinforced concrete with ducting and sleeves installed for the lighting columns. Along side the walkways a concrete cable trough was laid for cable management.
The great dedication from our workforce also contributed to Pod-Trak gaining additional scope by being awarded a contract to provide ETE support to complement Cleshar’s electrification works in the sidings.