Thameslink Key Output 2

Civil Engineering

November 2012 - November 2019

£6m

London

Download full PDF case study

As part of the redevelopment of London Bridge Station and the reconfiguration of the platforms a significant amount of civils had to be completed along the approach and around the station itself.

The civils scope varied across many items including:

  • De-veg
  • RRAP installation
  • Routeworks
  • Foundations
  • Signage
  • UTXs
  • LOC & REB bases
  • Hardstandings
  • Walkways
  • Access steps
  • Handrails & fencing
  • Signal structures & foundations
  • Equipment staging
  • Retaining walls
  • Cable installation & recoveries
  • Bridge arch repairs

All challenges such as unsuitable access, interface with other contractors and short working windows were counteracted with ‘outside-the-box’ thinking, proactive site teams and close coordination with the client to ensure all milestones were reached.