Heathrow Portal Upgrade

Civil Engineering

The Elizabeth line will significantly improve links between Heathrow and several central London destinations, significantly increasing demands on Heathrow Express.

Due to the anticipated increase in traffic, we worked collaboratively with Heathrow to update the infrastructure and to alleviate all potential disruptions.

The main issues were addressed through a series of linked work packages which enable Heathrow to continually provide excellent infrastructure availability of 99.75%.

The following scope was undertaken as part of the project:

  • Portal Security Improvement Works
  • Lighting
  • Electrical & Small Power
  • CCTV
  • Car Park – Permeable Paving

Our works included surveys, design, testing for Section 12 compliance and implementation. Pod Trak’s experience and knowledge of Heathrow assisted our client deliver the project without incident, on time and most importantly without disruption to Heathrow passengers.