Swansea Depot

Civil Engineering

October 2017 - August 2018

£1.5m

Swansea

Download full PDF case study

Pod-Trak was contracted to carry out all the civils modifications within the depot that were necessary to facilitate the maintenance and use of bi-mode trains being used on the Great Western Main Line.

The scope of works included UTXs, drainage, walkways, HV cable routes, concrete bases, a new layby and retaining structures. All works were carried out on midweek days with careful planning to ensure the depot remained operational at all times.

Deep excavations with poor ground conditions throughout the depot posed a constant challenge to the project team. Temporary works design and controls were key to making sure our teams and others within the depot were not put in any danger during the construction phase.

Works were facilitated by the use of in-house on track plant to move materials through the depot on a daily basis.