Leighton Buzzard Station AFA

June 2014 - October 2014

£200k

Leighton Buzzard

Download full PDF case study

As part of the AFA (Access for All) modifications at Leighton Buzzard Station, a new walkway bridge over the West Coast Main Line was installed across four tracks to provide access to all platforms.

To facilitate these works, Pod-Trak were subcontracted to design, supply and install new foundations, structures, SPS, headspans, wire splicing and re-profiling of the OLE through the bridge.

All works were carried out during possession/ isolation periods and necessary arrangements were put in place to protect the public during foundation installation.