Skip to content
  • 0845 450 4190
  • enquiries@pod-trak.com
  • Home
  • Who We Are
  • What We Do
    • Networks
    • Energy
    • Rail
    • Civil Engineering
  • Plant
  • Case Studies
  • ESG
  • Careers
  • News
  • Contact Us
  • Home
  • Who We Are
  • What We Do
    • Networks
    • Energy
    • Rail
    • Civil Engineering
  • Plant
  • Case Studies
  • ESG
  • Careers
  • News
  • Contact Us
Contact Us
  • Home
  • Who We Are
  • What We Do
    • Networks
    • Energy
    • Rail
    • Civil Engineering
  • Plant
  • Case Studies
  • ESG
  • Careers
  • News
  • Contact Us
  • Home
  • Who We Are
  • What We Do
    • Networks
    • Energy
    • Rail
    • Civil Engineering
  • Plant
  • Case Studies
  • ESG
  • Careers
  • News
  • Contact Us

Case Study Category: Civil Engineering

Orient Way Traincare CET – Infrastructure Upgrade

The Orient Way Traincare Depot plays a critical role in maintaining Greater Anglia’s rolling stock, operating on a 24/7 basis…

Beaulieu Park Station – Multi-Discipline Delivery (OLE, Track, Civils)

Pod-Trak delivered a fully integrated programme across OLE, Permanent Way, and Drainage over two years, from early…

Camphill Line Stations – Moseley, Kings Heath & Hazelwell

Pod-Trak was appointed by VolkerFitzpatrick as the main subcontractor responsible for delivering the FRC and Civils…

Next →

Follow us on:

Quick Links
  • Who We Are
  • ESG
  • What We Do
  • News
  • Case Studies
  • Contact Us
  • Who We Are
  • ESG
  • What We Do
  • News
  • Case Studies
  • Contact Us
Contact Company
  • 0845 450 4190
  • enquiries@pod-trak.com
  • One Oxford Rd, Denham, Uxbridge UB9 4BF

Copyright © 2025 Pod – Trak All rights reserved.

  • Modern Slavery
  • Privacy Policy