Pod-Trak was appointed as specialist Principal Contractor to deliver multi-discipline infrastructure upgrades at Greater Anglia’s Orient Way Traincare depot. The depot had to remain fully functional on a 24/7 basis while obsolete and failing infrastructure was renewed to support the introduction of new rolling stock.
The project ran from April 2023 to December 2024 and required civil, mechanical and electrical works to be phased through a live operational depot.
Early in the project, Pod-Trak identified significant GRIP 5 AFC design shortfalls, assumptions and compliance issues. These had to be resolved without compromising a tightly controlled possession and depot-operational programme.
The management team worked closely with Greater Anglia and the design team to close out deficiencies, manage interfaces and maintain the accepted programme while keeping the depot operational.
Orient Way demonstrates Pod-Trak’s ability to manage complex multi-discipline upgrades in a live depot, resolving design issues while maintaining safe railway operations and programme control.