Since October 2022, Pod-Trak has been engaged under a multi-year framework to survey Heathrow Airport’s Track Transit System tunnels, monitor water ingress and recommend remedial works.
Following agreed scopes, Pod-Trak completes dilapidation surveys, specialist resin injection repairs, ITP sign-off and post-works monitoring to confirm effectiveness.
Works are delivered airside within an operational airport environment, where security controls and access can make plant and material movements time-consuming. As Principal Contractor, Pod-Trak coordinates directly with Heathrow Airport Limited to manage access, methodology, progress and issues.
Through the framework, the team identified areas liable to future ingress and grouped remedial works where practical, reducing repeat disruption and improving cost efficiency. Airside storage licences also reduced daily plant movements, shifts and manual handling.
The framework demonstrates Pod-Trak’s ability to combine tunnel remediation, airside logistics, quality assurance and proactive asset monitoring in a live airport environment.
Want to see how we can deliver similar solutions? Browse our other case studies or get in touch with us today.