Data Centre – 110kV AIS Substation – Civil Engineering & Infrastructure Works

Project Overview

Pod-Trak was appointed to deliver the civil engineering, structural and associated infrastructure works for a new 110kV Air Insulated Switchgear (AIS) substation supporting a major data centre development in Austria. The project involved construction of reinforced concrete foundations, transformer bunds, underground services and associated infrastructure required to support the installation of high-voltage electrical equipment.

 

Pod-Trak provided overall project management and site delivery, coordinating specialist subcontractors, local resources, quality assurance and health and safety requirements. Our team also provided design review and constructability support to ensure the works were coordinated with the wider development programme.

Quick Facts

Client Name
Confidential
Project Location
Austria
Project Duration
9 Months

High Level Scope:

  • Site establishment, excavation, ground preparation and reinstatement
  • Pile cropping and construction of reinforced concrete AIS foundations and equipment plinths
  • Construction of transformer bunds and associated structural foundations
  • Installation of MV, HV, LV and ELV ducting networks, cable troughs and underground chambers
  • Construction of drainage systems, attenuation infrastructure and associated structures
  • Earthing and lightning protection installations coordinated with civil engineering works
  • Structural steel installation and associated support infrastructure
  • Access roads, hardstandings, security fencing and external works
  • Construction of 110kV cable route infrastructure connecting substations
  • Quality assurance, temporary works coordination and preparation for follow-on electrical installations

Key Challenges & Solution

Delivering a new substation within a major data centre development required careful coordination of civil, structural and electrical interfaces, alongside compliance with Austrian construction regulations and site requirements. Pod-Trak divided the works into defined construction zones, allowing foundations, underground services and external works to be sequenced while maintaining safe access for plant, materials and personnel.

 

Working with locally based resources and specialist subcontractors, the project team coordinated activities across multiple work fronts, using regular planning reviews to manage interfaces with other contractors. Inspection and Test Plans (ITPs), First of a Kind (FOAK) inspections and ongoing quality checks were used to maintain consistent construction standards.

Innovation in Action

Pod-Trak adopted a zonal construction strategy to improve coordination and reduce congestion across the site. Early design reviews and constructability assessments helped identify potential interfaces between foundations, underground services and electrical installations. By combining structured sequencing, local resource management and ITP-led quality assurance, the team established a coordinated approach to delivering the substation infrastructure while supporting the wider development programme.