As part of the Anglia Permanent Way Framework, Pod-Trak was awarded the renewal of existing longitudinal wheel timbers and associated components across five structures in the Anglia region. Pod-Trak was engaged as both Principal Contractor and Principal Designer, with surveys beginning in June 2025 to inform the design and delivery programme.
The works are spanned from June 2025 to March 2026 and were focused on returning the affected structures to compliant track geometry while minimising disruption to train services.
The works span five separate structures and must be coordinated around railway access and operational constraints. Pod-Trak used its in-house multi-discipline experience to revise the construction programme with Network Rail, targeting delivery with minimal disruption to train services.
Internal plant and POS resources also allowed the team to flex labour and equipment around programme requirements, helping maintain continuity and control over delivery.
The Anglia Wheel Timbers scheme demonstrates Pod-Trak’s ability to combine permanent way, design, plant and operational planning expertise to deliver complex bridge and track renewals with strong programme control.
Want to see how we can deliver similar solutions? Browse our other case studies or get in touch with us today.