Anglia Permanent Way Framework – Wheel Timbers

Project Overview

As part of the Anglia Permanent Way Framework, Pod-Trak was awarded the renewal of existing longitudinal wheel timbers and associated components across five structures in the Anglia region. Pod-Trak was engaged as both Principal Contractor and Principal Designer, with surveys beginning in June 2025 to inform the design and delivery programme.

The works are spanned from June 2025 to March 2026 and were focused on returning the affected structures to compliant track geometry while minimising disruption to train services.

Quick Facts

Client Name
Network Rail
Project Location
Anglia, UK
Project Duration
9 Months

High Level Scope:

  • Non-intrusive and intrusive surveys, design, management, supervision and stakeholder coordination.
  • Renewal of longitudinal wheel timbers using FFU bearers and replacement of holding-down arrangements.
  • Track geometry compliance for at least five chains either side of each structure.
  • Renewal of walkways, screws, pads, IBJs, clips, rails and ballast where required.
  • Provision of OTP, RRVs, trailers and attachments, safety-critical staff and OLE isolation.
  • Associated S&T, stressing, welding, temporary works, lift planning and waste management.

Key Challenges & Solution

The works span five separate structures and must be coordinated around railway access and operational constraints. Pod-Trak used its in-house multi-discipline experience to revise the construction programme with Network Rail, targeting delivery with minimal disruption to train services.

Internal plant and POS resources also allowed the team to flex labour and equipment around programme requirements, helping maintain continuity and control over delivery.

Innovation in Action

  • Challenged and improved design remits to support a minimum viable product approach where appropriate.
  • Proposed FFU bearers as an alternative to traditional wheel timbers, offering programme and whole-life benefits.
  • Used in-house plant, experienced POS staff and multi-discipline delivery capability to reduce reliance on subcontracted resource.
  • Integrated surveys, design, temporary works, permanent way and supporting disciplines under one delivery team.
  • The Anglia Wheel Timbers scheme demonstrates Pod-Trak’s ability to combine permanent way, design, plant and operational planning expertise to deliver complex bridge and track renewals with strong programme control.