Pod-Trak delivered approximately 700 m of 1 m, 900 mm and 600 mm diameter drainage with associated large-diameter manholes up to 8.5 m deep, running parallel to the new track slab at the north portal of the HS2 tunnel in Great Missenden.
The works were undertaken from April to September 2023 in a congested construction environment with multiple contractors operating alongside the drainage programme.
Access was highly constrained and the team had to integrate with multiple neighbouring operations while maintaining a challenging programme. Ground conditions also varied, with dissolution features in the chalk requiring local remediation and enhanced protection details.
Close communication with the client allowed remediation requirements to be identified and planned without affecting the overall programme.
The Align Drainage works show Pod-Trak’s ability to combine deep-excavation expertise, innovative temporary works and disciplined coordination to deliver complex drainage safely within a live major-project environment.