Align HS2 North Portal – Deep Drainage Works

Project Overview

Pod-Trak delivered approximately 700 m of 1 m, 900 mm and 600 mm diameter drainage with associated large-diameter manholes up to 8.5 m deep, running parallel to the new track slab at the north portal of the HS2 tunnel in Great Missenden.

The works were undertaken from April to September 2023 in a congested construction environment with multiple contractors operating alongside the drainage programme.

Quick Facts

Client Name
Align JV
Project Location
Great Missenden, Buckinghamshire, UK
Project Duration
3 Months

High Level Scope:

  • Installation of large-diameter drainage runs and deep manholes up to 8.5 m.
  • Deep excavation support using a slide-rail shoring system for the most demanding sections.
  • Local ground remediation and enhanced drainage protection where chalk dissolution features were encountered.
  • Heavy excavation using a 50-tonne excavator and a dedicated lifting team for material handling.
  • Coordination with neighbouring contractors and activities throughout the programme.
  • Development and regular practice of a robust trench-rescue plan.

Key Challenges & Solution

Access was highly constrained and the team had to integrate with multiple neighbouring operations while maintaining a challenging programme. Ground conditions also varied, with dissolution features in the chalk requiring local remediation and enhanced protection details.

Close communication with the client allowed remediation requirements to be identified and planned without affecting the overall programme.

Innovation in Action

  • Selected a modern slide-rail shoring system using a fast “dig and push” installation method.
  • Avoided the need for a piling hammer, trench-sheet damage risk, vibration installation risk and hydraulic systems.
  • Reduced lifting operations while enabling a typical pit or linear shoring section to be installed rapidly.
  • Accelerated the programme and reduced costs without disrupting neighbouring operations.
  • The Align Drainage works show Pod-Trak’s ability to combine deep-excavation expertise, innovative temporary works and disciplined coordination to deliver complex drainage safely within a live major-project environment.