Thameslink Key Output 2

Description

Expertise: Civil Engineering
Value: £2.7m

Minor trackside civils and route works forming the enabling works for the redevelopment and reconfiguration of London Bridge Station and the routes serving the station. The Civil Engineering minor works carried out in advance of the signalling equipment installations, particularly ahead of major blockades and possessions, and include the following principal elements of works carried out by Pod-Trak over the last two years:
signal structures and foundations, refurbishment of existing signal structures, trackside equipment bases and staging incl. retaining walls, trackside cable routes, access requirements arch fit out for new REBs, demolitions, recoveries, UTXs including longitudinal UTXs under S&C layouts.

  • Project Duration : October 2012 - Present
  • Categories : Civils
  • Client : Balfour Beatty Rail Ltd