New Cross Gate Depot (TFL)

Description

Expertise: Railway Electrification
Value: £1.2m

Pod-Trak were contracted to complete all Permanent Way works for the LOROL depot upgrade; these works included:

• The installation of new South End extension into the new platform at New Cross Gate station

• Installation of five track maintenance pits within the shed extension (slab track)

• Installation of New CV40 turnout

• Installation of 28no IBJ’s to accommodate signalling upgrade • Alterations to the P-Way on existing sidings (approx. 6km track renewals)

• Installation of 160m new embedded track c/w drainage • Installation of new bogie turntable

With careful planning and communication between Pod-Trak, Spencer Group and TfL, the Depot remained operational throughout the installation programme.

  • Project Duration : November 2013 – August 2015
  • Categories : Multi Discipline
  • Client : Spencer Group