Gravesend Station Remodelling

Description

Expertise: Civil Engineering Support, Railway Electrification, Engineering & Safety-Critical Staff Supply, Permanent Way
Value: £1.4m

Multi-discipline support to our Client.

With the core works carried out over a 15-day Christmas blockade in December 2013 in turbulent weather conditions and with a challenging programme, Pod-Trak firmly met the targets set by the client. Almost 1,500m of conductor rail was renewed, with 400m of new conductor rail installed.Pod-Trak’s Permanent Way team installed more than 1,000 sleepers during the installation of 982m of new track as part of an integrated team of skilled operatives, engineers and supervisors from both Spencer Group and Pod-Trak. There were zero RIDDORs or lost time injuries throughout the course of the project, testament to the team of ES, ES Assistant, COSS and Machine Controller competencies supplied to the project by Pod-Trak.

  • Project Duration : November 2013 - April 2014
  • Categories : Multi Discipline
  • Client : Spencer Group
VIEW DOCUMENTS
VIEW ACCREDITATIONS