Gravesend Station 4D Analysis of 15 Day Blockade

Gravesend Station 4D Analysis of 15 Day Blockade

12 December 2013 Posted by Pod-Trak Ltd Media

Oakwood Engineering partnered with Schofield Lothian, Network Rail and C Spencer Ltd to deliver a 4D analysis model for the 15 day blockade at Gravesend Station. The construction programme is electronically linked to 3D models to form a dynamic model that visualises and optimises the project

VIEW ACCREDITATIONS